|Your Outdoor Project, Simplified.
Village-level HOA requirements, ARC approval process, reclaimed water access, SWFWMD compliance, and 2025 pricing — the complete LWR irrigation guide by village.
Each LWR village has distinct HOA irrigation requirements. What's approved in Waterside differs from Esplanade differs from Lorraine Lakes. Know your village rules before specifying anything.
Premium new construction — smart controller required, ARC pre-approval, drip in all common-adjacent planting beds
Luxury resort HOA — detailed landscape covenant, approved controller list on file, rain sensor mandatory
Active construction zone — system design must account for ongoing grade changes in adjacent lots, HOA inspection required
HOA irrigation zone buffer required along rear conservation areas — drip in back bed zones strongly recommended
Older LWR village — many systems 10–15+ years old needing smart controller retrofit and head replacement
Large estate lots — higher zone count (8–12 zones typical), full smart system with flow sensor recommended
No irrigation system should be installed in Lakewood Ranch without written ARC approval. SunWest prepares complete ARC application packages including site plan, zone layout, controller specifications, and contractor documentation. Typical ARC review time: 2–4 weeks. Plan accordingly for new LWR irrigation projects.
Full LWR irrigation service page — installation, repair, smart upgrades, ARC coordination
State hub — SWFWMD county guide, system types, all city buyer's guides
Manatee County irrigation permit requirements + LWR ARC process overview
LWR village sod guide — HOA compliance, Zoysia dominance, ARC approval
LWR village paver spec guide — travertine standard, HOA approval by village
Complete LWR city hub — all services, village guide, buyer's guides
Free assessment + ARC application prep for Lakewood Ranch irrigation projects. We know your village's requirements before we design anything.